Deepwater · Asia · 2025
1600 m Deepwater SURF Gas Development
FEED through start-up of a 1600 m deepwater SURF programme with integrated subsea XT and FPU commissioning — delivered ahead of schedule with zero LTI.
Proven EPCC expertise from FEED to Start-up — delivering practical, cost-effective solutions for Oil & Gas and Renewable Energy projects.
Front-end concept, options & specs ready for ITT.
Scope, deliverables & evaluation criteria defined.
Costed plan, risk & schedule baseline.
Engineering, fabrication, installation oversight.
Commissioning, handover & performance ramp-up.
De-risk early with robust concepts, costed options, and specification-ready ITT packages aligned to class and client standards.
From code checks to non-linear FEA, we validate integrity, fatigue life, stability, and constructability before steel is cut.
Buildable, practical methods for yard and offshore: lift plans, seafastening, procedures, check-sheets, and readiness.
Selected projects showcasing RROC's delivery from FEED through start-up across deepwater, renewables and topsides modifications.
Deepwater · Asia · 2025
FEED through start-up of a 1600 m deepwater SURF programme with integrated subsea XT and FPU commissioning — delivered ahead of schedule with zero LTI.
Renewables · UK→Asia · 2023
Quayside-to-HLV load-out of OWF turbines and ancillaries with full lift-plan and certification compliance — zero incidents under commercial pressure.
Mechanical, electrical, instrumentation and subsea modifications on a live FPSO to prepare the topsides for a seamless offshore tie-back campaign.
Our engineering solutions are aligned with industry-leading standards and best practices across both Oil & Gas and Renewable Energy sectors. We adapt our approach to meet the unique requirements of each project while maintaining the highest safety and quality standards.
Phase 1
Initial concept development and feasibility studies
Phase 2
Scope definition and vendor selection process
Phase 3
Technical and commercial proposal submission
Phase 4
Engineering, procurement, and construction activities
Phase 5
Commissioning and performance testing